- SELECTED FILTER
-
Alabama
-
|
27 opportunities found for search criteria: Construction Equipment, Materials & Supplies
for Listed
|
Title and Categories
|
Delivery Regions |
Published Date
|
Closing Date
|
ELECTRICAL SUBSTATION SITE WORK FOR OPS
EQUIPMENT MAINTENANCE AND REPAIR SERVICES FOR GENERAL EQUIPMENT
|
Alabama
|
2023/01/11
|
2023/02/13
|
SERVICE CONTRACT FIRE SPRINKLER AND BACKFLOWPREVENTER INSPECTIONS AND REPAIRSAT VARIOUS CITY OF MOBILE FACILITIES
EQUIPMENT MAINTENANCE AND REPAIR SERVICES FOR GENERAL EQUIPMENT
|
Alabama
|
2023/01/19
|
2023/02/15
|
Anchor Plate, Wire
Rope, Cable, Chain & Fittings
|
Alabama
|
2023/01/19
|
2023/03/04
|
Glass Purchase
Nonmetallic Fabricated Materials
|
Alabama
|
2023/01/20
|
2023/02/21
|
FY 2023-08 NEAR MEGASITE 500,000 GALLON ELEVATED WATERTANK
TANKS (METAL, PLASTIC, WOOD, AND SYNTHETIC MATERIALS): MOBILE, PORTABLE, STATIONARY, AND UNDERGROUND TYPES
|
Alabama
|
2023/01/25
|
2023/02/28
|
Refrigeration Services
EQUIPMENT MAINTENANCE AND REPAIR SERVICES FOR GENERAL EQUIPMENT
|
Alabama
|
2023/01/26
|
2023/02/09
|
Planetary, Lunar, & Asteroid Natural Environment Testbed (PLANET) Vacuum Vessel & Pumping System
Pumps & Compressors
|
Alabama
|
2023/01/26
|
2023/02/24
|
Plumbing Equipment, Parts, and Supplies
PUMPING EQUIPMENT AND ACCESSORIES
PLUMBING EQUIPMENT, FIXTURES, AND SUPPLIES
|
Alabama
|
2023/01/27
|
2023/02/16
|
PURCHASE OF SUBMERSIBLE PUMP
PUMPING EQUIPMENT AND ACCESSORIES
|
Alabama
|
2023/01/27
|
2023/02/08
|
Chiller (Materials Only)
AIR CONDITIONING, HEATING, AND VENTILATING EQUIPMENT, PARTS AND ACCESSORIES (SEE CLASS 740 ALSO)
|
Alabama
|
2023/01/28
|
2023/02/09
|
Perdido Pass Seawall Park Post-Hurricane Sally Repairs
FENCING
|
Alabama
|
2023/01/31
|
2023/02/23
|
Hardware
BUILDER'S SUPPLIES
HARDWARE AND RELATED ITEMS
|
Alabama
|
2023/01/31
|
2023/02/08
|
Transportation Letting
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
|
Alabama
|
2023/01/31
|
2023/02/24
|
Transportation Letting
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
|
Alabama
|
2023/01/31
|
2023/02/24
|
Constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) Westbound Lanes and the Widening (Grading, Drainage, and Pavement), Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) Eastbound Lanes from the intersection of SR-14 to the...
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
|
Alabama
|
2023/01/31
|
2023/02/24
|
|
|
|