MERX  
Login
11 opportunities found for search criteria: Construction Equipment, Materials & Supplies for Listed
Title and Categories Delivery
Regions
Published Date
Closing Date
Safety Widening, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-175 from the junction of SR-14 northeast of Marion to the junction of SR-5 south of Heiberger
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Constructing the Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-9 from the junction of SR-4 (US-78) west of Heflin to a point 0.070 mile south of the Nature Trail (MP 230.233).
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Safety Widening, Resurfacing (Scrub Seal), Guardrail Reset, and Traffic Stripe on SR-41 from the junction of CR-17 to the Wilcox County Line. Length 9.155 mi.
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
e Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of SR-2 (US-72) to the I-65 Underpass in Athens
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Planing, Resurfacing, and Traffic Stripe on SR-5 (US-78) from the junction of SR-378 (Finley Boulevard) to the junction of Cherry Avenue in Birmingham. Length 1.528 mi.
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
e Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on SR-18 (US-43) over Deadwater Creek west of Bankston. Length 0.510 mi
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Constructing the Road Safety Assessment Sites (Guardrail Installation) on SR-5, SR-7, and SR-13 at various locationsin the West Central Region as indicated in the plans.
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Planing, Resurfacing, and Traffic Stripe on I-10 through the Wallace Tunnel in Mobile
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Pavement Rehabilitation (Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe) on I59 from the Jefferson County Line to north of the SR-23 Overpass southeast of Springville. Length 8.655 mi.
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Constructing the Roadway Safety Assessment Sites (Guardrail Installation) on SR-6, SR-13, SR-17, and SR-269 atvarious locations in the West Central Region as indicated in the plans.
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on CR-8 (Redland Road) over Harwell Mill Creek to include the Widening, Intersection Improvements, Resurfacing, Traffic Signals, and Traffic Stripe on CR-8 (Redland Road) and CR-4 (Ri...
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26

1
   
 
� MERX - All rights reserved