MERX  
Login
22 opportunities found for search criteria: All for Listed
Title and Categories Delivery
Regions
Published Date
Closing Date
Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on CR-2 (Forest Highway 5) from the junction of SR-195 to the intersection of SR-33 north of Double Springs. Length 5.400 mi
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26
Safety Widening, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-175 from the junction of SR-14 northeast of Marion to the junction of SR-5 south of Heiberger
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS
Alabama 2021/03/03 2021/03/26
Constructing the Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-9 from the junction of SR-4 (US-78) west of Heflin to a point 0.070 mile south of the Nature Trail (MP 230.233).
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
...
Alabama 2021/03/03 2021/03/26
Safety Widening, Resurfacing (Scrub Seal), Guardrail Reset, and Traffic Stripe on SR-41 from the junction of CR-17 to the Wilcox County Line. Length 9.155 mi.
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
ROADSIDE, GROUNDS, RECREATIONAL AND PARK AREA SERVICES
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
...
Alabama 2021/03/03 2021/03/26
e Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the junction of SR-2 (US-72) to the I-65 Underpass in Athens
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
...
Alabama 2021/03/03 2021/03/26
Safety Widening, Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe on SR-6 (US82) from the junction of Duncanville School Road to 1.000 mile east of the junction of Lake Payne Road in Duncanville
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26
Planing, Resurfacing, and Traffic Stripe on SR-3 from the north end of the CSX Railroad Bridge (MP 95.972) in Evergreen to MP 102.000
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
MISCELLANEOUS SERVICES, NO. 1 (NOT OTHERWISE CLASSIFIED)
Alabama 2021/03/03 2021/03/26
Planing, Resurfacing, and Traffic Stripe on SR-5 (US-78) from the junction of SR-378 (Finley Boulevard) to the junction of Cherry Avenue in Birmingham. Length 1.528 mi.
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
ROADSIDE, GROUNDS, RECREATIONAL AND PARK AREA SERVICES
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
...
Alabama 2021/03/03 2021/03/26
e Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on SR-18 (US-43) over Deadwater Creek west of Bankston. Length 0.510 mi
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
ROADSIDE, GROUNDS, RECREATIONAL AND PARK AREA SERVICES
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
...
Alabama 2021/03/03 2021/03/26
Micro-Milling, Resurfacing, and Traffic Stripe on I-565 from 0.280 mile east of the Intergraph Way Underpass (MP 10.100) to 0.260 mile east of the Triana Boulevard Overpass (MP 18.322) in Huntsville
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
MISCELLANEOUS SERVICES, NO. 1 (NOT OTHERWISE CLASSIFIED)
Alabama 2021/03/03 2021/03/26
Constructing the Micro-Surfacing, Scrub Seal, and Traffic Stripe on SR-145 from the I-65 Underpass to a point south ofthe Waxahatchee Creek Bridge northeast of Clanton. Length 10.846 mi.
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26
Planing, Resurfacing, and Traffic Stripe on I-10 through the Wallace Tunnel in Mobile
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
ROADSIDE, GROUNDS, RECREATIONAL AND PARK AREA SERVICES
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
...
Alabama 2021/03/03 2021/03/26
Pavement Preservation (Planing, Resurfacing, Guardrail Installation, and Traffic Stripe) on I-85 from the Montgomery County Line to the junction of SR-138.
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26
Constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe on SR-3 (US-31) from a pointsouth of the Bay Minette City Limits (MP 17.489) to the junction of West Pine Street to include Intersection Improvementsat SR-59. Length ...
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26
Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31) from the North City Limitsof Prattville to the I-65 Interchange. Length 3.714 mi
CONSTRUCTION SERVICES, HEAVY (INCL. MAINTENANCE AND REPAIR SERVICES)
CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR SERVICES)
PUBLIC WORKS AND RELATED SERVICES
Alabama 2021/03/03 2021/03/26

1 2 Next »
   
 
� MERX - All rights reserved